pixel

Handbook

  1. Home/
  2. Handbook/
  3. 1.2. Professional Interior Design Can Save Money

1.2. Professional Interior Design Can Save Money

Modern interior design is simpler and more reliable to order from professionals than to create it yourself. Why? Our article will explain.

 

How a design project helps save the budget without losing quality

 

The services of a professional designer make up to 10% of the cost of all planned work. But it turns out that it includes a package of technical documents, which not only helps reduce the expenses on a grand renovation of the dwelling but also saves a considerable amount of money in the subsequent years of life in a comfortable home. How is this achieved?

 

  1. Creation of three-dimensional graphics or, as it is also called, 3D visualization. Computer programs are used to create a photographically accurate volumetric representation of each room with all the details of the future interior: furniture, textiles, decor items. Thorough visualization of the future dwelling allows you to see the final result before starting the renovation and construction work. This graphic is created not only for the customer to familiarize themselves with the planned final outcome. 3D graphics are mandatorily used by the performers of individual renovation processes to see the final result. This helps to eliminate misunderstandings of tasks, rectify inaccuracies in their execution.

 

Savings: Minimizing the risk of rework, reducing work time.

 

  1. Creation of a situational plan to fix all defects that need to be addressed: irregularities in the ceiling, floor, walls; assessment of the condition of windows, doors, technical communications. This allows for a more accurate determination of the necessary amount of material for rough finishing, choosing materials at the optimal price.

 

Savings: Purchasing materials for renovation and construction in the necessary calculated quantity at optimal prices.

 

  1. Creation of a plan for the erection of partitions. Engineering and technical development of structures conforming to construction standards and work technologies.

 

Savings: No defects and subsequent rework in construction work on the erection of partitions, using the calculated amount of materials; after the renovation, there are no problems with putting the premises into operation.

 

  1. Creating wall layouts in bathrooms. Helps visualize the future beauty of tile laying, placement of furniture, and plumbing. Based on the layouts, a specification is compiled to determine the quantity and quality of purchased materials, and a budget is formed.

 

Savings: Purchasing only the necessary quantity of materials, controlling their consumption; eliminating material damage due to installation errors.

 

  1. Development of technical specifications for heating, ventilation, air conditioning. Development is carried out taking into account the individual characteristics of the building, construction work by related directions, design specifics, in accordance with regulatory compliance norms.

 

Savings: Eliminating errors in the interrelation with related construction processes, communication works, and design requirements; no problems in putting the finished space into operation.

 

  1. Development of technical specifications for custom-made items.

 

Savings: Specially manufactured items initially take into account all nuances and specifics: installation considering related processes, design, excluding reworks and corrections. At the same time, it is possible to choose raw materials and manufacturers that allow obtaining the necessary quality at the minimum price.

 

  1. Development of a furniture layout plan. Created in conjunction with the development of wall planning. Allows for maximum and efficient use of space.

 

Savings: No defects, reworks during furniture installation.

 

  1. Formation of a floor plan. Aesthetic and logical components will help determine the necessary amount of floor coverings.

 

Savings: Optimal purchase, controlling the consumption of materials during installation.

 

  1. Development of a heated floor plan. Determining the correct layout of components, excluding heating under furniture in other ineffective areas. Compiling a specification with a full calculation of the necessary materials and expenses on them.

 

Savings: Excluding ineffective use of floor heating, preventing damage to adjacent materials (e.g., next to laid parquet); purchasing only the necessary quality and quantity of components, controlling their consumption during installation.

 

  1. Development of a lighting fixture layout plan taking into account all the needs of the residents and excluding problems of incorrect lighting in the room. Forming various comfortable lighting scenarios considering power outlets. Compiling a specification with a calculation of the quantity of components.

 

Savings: No expenses on rework during installation; controlling the consumption of components.

 

  1. Development of a switch layout plan. Coordination of control over all alarm systems, power supply. Developing a specification taking into account the exact number of necessary components.

 

Savings: Excluding the possibility of short circuits and the occurrence of fires; organizing the correct coordinated work of low-current systems: TV, internet, telephone, etc.

 

  1. Development of a plan for equipping premises with electrical outlets based on existing electrical engineering norms, considering the layout of other systems in the house.

 

Savings: All systems in the house (electrical and low-current) operate smoothly, without interruptions, excluding short circuits and fires, excluding defects during installation and subsequent elimination; after renovation, the premises are put into operation without problems.

 

  1. Compilation of a finishing statement. It includes a list of all materials needed for finishing work, addresses of suppliers of quality materials at optimal prices.

 

Savings: No need to conduct a tender for suppliers in search of the desired quality at the desired price; all materials are purchased only in necessary quantities; the possibility of controlling the expenditure of purchased funds during work.

 

Adding up all the possibilities of saving time, finances, physical strength, and nerve cells for each point of technical work, it becomes clear that a person ordering these works from professionals is deprived of one thing – a huge, difficult, hectic, and unpredictable piece of life. In return, they get comfort and a responsible professional who will do this important front of work for them.

Other chapter

While using this site, you acknowledge your consent to use cookies in accordance with the notification in respect of that type of files. Learn more

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close